As Scripps strives to provide the highest quality of healthcare to its patients, Davy joined their goal by provided design and construction services to remodel Cath Lab 3 and install a new Siemens Artis Q. The goal was to optimize the performance of the Cath Lab and improve clinical outcomes during intervention. This equipment is built for "visionary intervention" by providing precise guidance during procedures.

Special care was taken in design to accommodate all the strict requirements of the manufacturer, and close coordination with the vendor was key. The challenges for this project included older infrastructure, which has a very congested above ceiling space. The existing HVAC system was also very difficult to work with, and it took a team of the Facility Engineering Rep, our Mechanical Engineer, and the TAB Company working together in person during the TAB to balance the system to comply with Construction Documents.